01 · Ground improvement
DCDR
Crane log for dynamic replacement
Built for Menard. On a dynamic replacement job, a crawler crane lifts a heavy
pounder and drops it, blow after blow, on a grid of marked points. Every point
is a "print", and every blow, depth and breakdown has to be recorded.
Operators now log each print from the cab by tapping it on the plan,
and the site office sees it the moment it's saved.
Private deployment, access by invitation. Ask for a walkthrough →
- Client
- Menard
- Built
- Cab logging app and site office dashboard
- Records
- Prints, blows, penetration, energy, breakdowns, stand-bys and diesel, per rig and per shift
- Gives the office
- Live progress per box and per pass, alerts, and daily reports ready to export
- Status
- In production on an active site